热门标签

三公开船棋牌游戏:Healthy M&A trend seen in South-East Asia

时间:12小时前   阅读:3   评论:4

三公开船棋牌游戏www.eth108.vip)(三公大吃小)是用以太坊区块高度哈希值开奖的棋牌游戏,有别于传统三公开船(三公大吃小)棋牌游戏,三公开船游戏(三公大吃小)游戏绝对公平,结果绝对无法预测。三公开船棋牌游戏(三公大吃小)由玩家PK,平台不参与。

CLICK TO ENLARGEPETALING JAYA: The mergers and acquisitions (M&As) trend in South-East Asia is expected to remain healthy for the rest of the year and slated to reach a total value of US$100bil (RM445bil).

According to Frost and Sullivan business and financial services senior vice-president Sanjay Singh, the region saw a busier period in the first half of this year as a whole in terms of M&As.

In comparison, the average value of M&As for the region from 2015 to 2019 was hovering about US$25bil (RM112bil) annually, he said in his presentation on the prospects of M&As at the Asia-Pacific outlook webinar organised by Frost & Sullivan yesterday.

However, Frost and Sullivan expects the number of M&As in South-East Asia to dip to about 414 deals this year, which is a significant drop from 640 deals last year, albeit the higher value expectations.

,

Allbet开户www.aLLbet8.vip)是欧博集团的官方网站。欧博官网开放Allbet注册、Allbe代理、Allbet电脑客户端、Allbet手机版下载等业务。

,

Owing to the economic reopening and post-pandemic, the business consulting firm noted that M&As rose significantly to a total value of about US$60bil (RM269bil) in 2021 with a total of 640 deals.

Globally, 2021 was a blockbuster year for M&As, recording a significant jump to about 63,000 M&A deals compared with 50,000 in the pre-pandemic.

Consequently, there was also a notable increase in the value of M&As for 2021 globally, reporting a total value of almost US$6 trillion (RM26.9 trillion)

For comparison, pre-pandemic, the total value of M&As was hovering slightly below US$4 trillion (RM18 trillion).


转载说明:本文转载自Sunbet。

上一篇:足球胜负预测(www.99cx.vip):Pakistan\u2019s south braces for deluge from swollen northern rivers

下一篇:erc20转换trc20:Wall St heads for lower open on rate hike worries

网友评论

  • 2022-09-12 01:18:44

    "This brownfield project will start with the demolition of the existing plant next year and this will take two years. Construction of the project will commence from 2025 and the entire complex is scheduled to be ready in 2030,” he added.一定一定要看这个!